Save this image free of charge in 800 pixels for layout use (right click, Save as...)
|
|
Ref : S04681
Theme :
Space Shuttle - General (1045 images)
Title : STS-49 Shuttle Endevour in Mate-Demate Device being Loaded onto SCA-747 - Front View
Caption :
The Space Shuttle Endeavour being loaded onto NASA's Shuttle Carrier Aircraft in the Mate-Demate Device (MDD) at the Ames-Dryden Flight Research Facility (later redesignated Dryden Flight Research Center), Edwards, California, shortly before being ferried back to the Kennedy Space Center, Florida. Endeavour landed at 1:57 p.m. (PDT) 16 May 1992, marking the completion of the new orbiter's first mission in space during which the crew of seven rendevoused with the Intelsat VI satellite, attached a booster motor, and redeployed it into a high geosynchronous orbit. Endeavour and its crew was launched on a planned 7-day mission 7 May 1992, but the landing was delayed two days to allow extra time to rescue Intelsat and complete space station assembly techniques originally planned.
|
|